Loading

Indian Brook Commons

  • Up to 68,000 SF new construction
  • Term available until 6/30/2025
  • Located at the intersection of Route 9 and Route 108
  • 24,000 ADT on Route 9
    23,000 ADT on Route 108

24,000ADT on Route 9